Pre-purchase inspection
Ask which areas the seller will allow the assessor to access and whether sampling needs permission. A standard building report may flag suspected material. If you need a result before a contract deadline, confirm the site visit, lab turnaround and written report dates separately.
Pre-renovation or demolition inspection
Send the assessor your scope or drawings. Ask whether the inspection covers each wall, floor, ceiling or outbuilding affected by the job. Ask how concealed areas are handled and what happens if the builder finds material outside the inspected scope.
What should the report say?
Look for a location-by-location summary, sample references and laboratory results where applicable, inaccessible areas and recommendations. An exclusion matters if the builder will open that area. Ask who can explain the findings and whether a follow-up visit is included.
How to compare inspection fees
Ask for the site visit fee, included sample count, extra sample rates and report turnaround. For a workplace, clarify whether the brief includes support with an asbestos register or management plan. These are separate deliverables from a simple laboratory result.